Treatment references

                                               Multi-utility waste treatment facility      
Fos sur Mer (13)

 

 

Project Owner:                        MARSEILLE PROVENCE MÉTROPOLE 

Type of contract:                   Design, construction, financing, project management, and operation of a multi-utility                                                       waste treatment facility

Technology implemented:   - Mechanical sorting line for solid household waste

                                             - Methanisation unit for the organic fraction of solid household waste after sorting

                                             - Waste-to-Energy unit for the combustible fraction of waste after sorting

                                             - Waste air treatment unit

                                             - Excess water treatment unit

Treatment capacity:               410 000 t/year of household and related waste

Electric power generation:     240 GWh/year

                                                                                              

                               Methanisation plant
                                                                        in Varennes-Jarcy (91)

 

Project Owner:                         SIVOM of la Vallée de l’Yerres et des Sénarts

Type of contract:                      Public service delegation to operate the household waste
                                                separation-methanisation-composting plant

Technology implemented:    - Pre-processing by 2 rotating drums

                                             - Mechanical sorting line

                                             - Methanisation unit (Valorga process)

                                             - Aerobic maturation in halls

                                             - Waste air treatment unit - Excess water treatment unit

Treatment capacity:               70 000 t/year of residual household waste 

                                                6 000 t/year of green waste

 

 

 

                                                                            Beijing (China)        

 

Type of contract:                     Engineering, supply of process equipment, and commissioning of the methanisation unit                   
Technology implemented:    - Unit for introducing organic matter by piston pump                                                                                                      - Valorga digesters (3 digesters, 4 500 m3 each)

                                              - Digestate dehydration unit

Treatment capacity:               105 000 t/year of the separated organic fraction from household waste

 

 

 

                                               Shanghai (China)

 

Type of contract:                      Engineering, supply of process equipment, and commissioning

Technology implemented:    - Unit for introducing organic matter by piston pump

                                              - Valorga digesters (3 digesters, 4 500 m3 each)

                                              - Digestate dehydration unit

Treatment capacity:                227 500 t/year of solid household waste
                                                41 000 t/year of compostable waste



 

                                                           Methanisation plant in Tondela (Portugal)       

 

Project Owner:                         CITY OF TONDELA

Type of contract:                     Design, construction (except civil engineering), project management, and commissioning                                                  of the methanisation unit

Technology implemented:    - Mechanical sorting line

                                              - Anaerobic digestion (Valorga process)

                                              - Post-composting

                                              - Waste air treatment unit 

Treatment capacity:                30 000 t/year of solid household waste 
                                                5 000 t/year of compostable waste

Biogas production:                 136 Nm3/t entering methanisation

 

 

 

                                          Waste sorting and composting
                                                                              facility in Etoile sur Rhône (26)

 

Project owner                           SYTRAD

Type of contract:                    Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility

Technology implemented:    - Pre-fermentation by 2 rotating drums

                                              - Mechanical sorting line

                                              - Aerobic fermentation in halls

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:               80 000 t/year of solid household waste

 


 

                                                           Waste sorting and composting facility                   
                                                                    in Beauregard Baret (26)

 

Project owner                           SYTRAD

Type of contract:                     Design, construction, supervision, and “turnkey” commissioning of the waste sorting and                                                  composting facility

Technology implemented:    - Pre-fermentation by 2 rotating drums

                                              - Mechanical sorting line

                                              - Aerobic fermentation in halls

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:                30 000 t/year of solid household waste

 

 

 

                      Waste sorting and composting facility
                                                                        in Saint Barthélémy de Vals (26)

 

Project owner                           SYTRAD 

Type of contract:                     Design, construction, supervision, and “turnkey” commissioning of the waste sorting and                                                  composting facility

Technology implemented:    - Pre-fermentation by 2 rotating drums

                                              - Mechanical sorting line

                                              - Aerobic fermentation in halls

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:               40 000 t/year of solid household waste

 

 

 

                                                         Modernisation of the Las Dehesas (Spain)              
                                                                      Environmental Complex   

 

Project Owner:                         COMMUNITY OF MADRID

Type of contract:                      Design and commissioning of the methanisation unit

Technology implemented:     - Mechanical sorting line

                                              - Anaerobic digestion unit (Valorga process)

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:               195 200 t/year of solid household waste 

Biogas production:                  130 Nm3/t entering methanisation


 

                            Methanisation plant in Saragossa (Spain) 

 

Project owner                           CITY OF SARAGOSSA 

Type of contract:                      Design and commissioning of the methanisation unit

Technology implemented:    - Mechanical sorting line

                                             - Anaerobic digestion unit (Valorga process)

                                             - Aerobic maturation

                                             - Waste air treatment unit

Treatment capacity:               95 500 t/year of solid household waste

Electric power generation:     4 MWe 

 

 

                                                          Modernisation of the treatment facility          

                                                                       in La Paloma (SPAIN)

 

Project Owner:                         COMMUNITY OF MADRID

Type of contract:                      Design and commissioning of the methanisation unit

Technology implemented: - Mechanical sorting

                                              - Methanisation (Valorga process)

                                              - Drying tunnels

                                              - Air treatment

Treatment capacity:               110 000 tonnes per year (methanisation)

Biogas production:                 127 Nm3/t entering methanisation

 

 

                     

 

                         Multi-utility facility in Romainville (93)

 

Project Owner:                   SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate)

Type of contract:                  Reconstruction and operation of the selective collection sorting facility

Treatment capacity:        Selective collection sorting facility: 45 000 t/year (extendible to 60 000 t/year)

 

 

                                                                       Methanisation plant in       

                                                             the Ecopark of Abrunheira (Portugal)

 

Project Owner:                         TRATOLIXO

Type of contract:                      Design, construction, and commissioning of the methanisation facility

Technology implemented:    - Mechanical sorting line

                                              - Anaerobic digestion (Valorga)

                                              - Aerobic maturation unit

                                              - Waste air treatment unit

                                              - Liquid waste treatment station

Treatment capacity:                160 000 t/year of solid household waste
                                                40 000 t/year of biowaste

Biogas production:                 130-150 Nm3/t

  

 

 

                                 Household waste sorting and composting

                                                                       Facility in Château d’Olonne(85)

 

Project Owner:                         TRIVALIS

Type of contract:            Design, construction, and project management of a mechanical-biological sorting and composting plant for household and related waste

Technology implemented:    - Pre-fermentation by 1 rotating drum

                                              - Mechanical sorting line

                                              - Aerobic fermentation in tunnelss

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:                36 000 t/year of residual household waste + 10 000 t/year of bulky household waste

 

 

 


                                                                    Household waste sorting and               
                                                             composting facility in Caupenne (40)
 

 

 

Project Owner:                         SIETOM OF CHALOSSE

Type of contract:                     Design, construction, and project management of the solid household waste sorting and                                                    composting plant

Technology implemented:    - Pre-fermentation by 1 rotating drum

                                             - Mechanical sorting line

                                              - Aerobic fermentation in halls

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:               25 000 t/year of solid household waste

 

 

 

                      Household waste recovery unit in Bayonne (Canopia) (64)

 

 

Project Owner:                         BIL TA GARBI

Type of contract:                      Design, construction, project management, and operation

Technology implemented:    - Pre-fermentation by 3 rotating drums

                                              - Mechanical sorting line

                                              - Anaerobic digestion unit (Valorga process)

                                              - Aerobic maturation

                                              - Waste air treatment unit

Treatment capacity:               83 696 t/year of solid household waste

                                                15 000 t/year separated collection
                                                1 500 t/year biowaste

Biogas production:                 140 Nm3/t entering methanisation 

 

 

 
                                                           Organic Recovery Facility (French CVO)            
                                                                    for biowaste in Calaisis (62)

 

 

 

Project Owner:                         SEVADEC

Type of contract:                      Design, construction, project management, and “turnkey” commissioning

                                                Operation and maintenance of the CVO facility

Technology implemented:    - Mechanical sorting line

                                              - Anaerobic digestion (Valorga process)

                                              - Aerobic maturation in ventilated tunnels

                                              - Waste air treatment unit

Treatment capacity:                27 000 t/year of compostable waste
                                                1 000 t/year of greases

Biogas production:                  110 - 120 Nm3/t entering methanisation