Multi-utility waste treatment facility in Fos-sur-Mer


Project Owner : Métropole Aix-Marseille Provence (13)
Type of contract : Design, construction, financing, project management, and operation of a multi-utility waste treatment facility
Treatment capacity : 410 000 t/year of household and related waste
Technology implemented :

  • Mechanical sorting line for solid household waste
  • Methanisation unit for the organic fraction of solid household waste after sorting
  • Waste-to-Energy unit for the combustible fraction of waste after sorting
  • Waste air treatment unit
  • Excess water treatment unit

Electric power generation : 240 GWh/Year
Website :    www.evere.fr
Adress : 
Route du Port Minéralier - Zone Caban Sud - 13210 Fos sur Mer - France

Evere household waste facility in Métropole Aix-Marseille Provence

Organic Recovery Facility (French CVO) for Household waste in Calaisis

Project owner : SEVADEC (62)
Type of contract : Design, construction and project management
Treatment capacity :

  • 46 000 t/y of household wastes
  • 6 000 t/y of landfilling
  • 800 t/y of cumbersome

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion (Valorga Process)

Starting date : 2020
Adress : 281 rue Jacques Monod - 62101 Calais - France


Methanisation plant in Varennes-Jarcy


Project owner : SIVOM de la Vallée de l’Yerres et des Sénarts (91)
Type of contract : Public service delegation to operate the household waste separation-methanisation-composting plant
Treatment capacity :

  • 45 000 t/year of residual household waste
  • 30 000 t/year of green waste

Technology implemented :

  • Pre-processing by 2 rotating drums
  • Mechanical sorting line
  • Methanisation unit (Valorga process)
  • Aerobic maturation in halls
  • Excess water treatment unit

Adress : SIVOM de la Vallée de l'Yerres et des Sénarts - Route du Tremblay - 91480 Varennes-Jarcy - France

Methanisation plant in Varennes-Jarcy


Methanisation plant in Tondela (Portugal)

Project owner : City of Tondela
Type of contract : Design, construction (except civil engineering), project management, and commissioning of the methanisation unit

Treatment capacity :

  • 30 000 t/year of solid household waste
  • 5 000 t/year of compostable waste

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion (Valorga process)
  • Post-composting
  • Waste air treatment unit

Biogas Production : 136 Nm3/t entering methanisation
Starting date : 2010
Adress : Vale de Marguanda - 465-013 Campo de Besteiros Viseu - Portugal

Waste sorting and composting facility
in Beauregard Baret

Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 30 000 t/year of solid household waste
Technology implemented :

  • Pre-fermentation by 2 rotating drums
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit

Electric power generation : 240 GWh/an
Starting date : 2010
Adress : D532 - 26300 Beauregard-Baret - France


Centre de tri-compostage
de Saint Barthélémy de Vals

Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 40 000 t/year of solid household waste
Technology implemented l’ :

  • Pre-fermentation by 2 rotating drums
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit

Starting date : 2010
Adresse : D532 - 26300 Beauregard-Baret - France

 


Centre de tri-compostage d’Etoile sur Rhône


Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 40 000 t/year of solid household waste
Technology implemented l’ :

  • Pre-fermentation by 2 rotating drums
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit

Starting date : 2012
Adress : D532 - 26300 Beauregard-Baret - France


Modernisation of the Las Dehesas Environmental Complex

Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 195 200 t/year of solid household waste
Technology implemented :

  • Chaîne de tri mécanique
  • Unité de digestion anaérobie (procédé Valorga)
  • Maturation aérobie
  • Unité de traitement de l’air vicié

Biogas Production :  130 Nm3/t entering methanisation
Starting date : 2008
Adress : Ctra. N-III. Km. 14 - (Villa de Vallecas) - 28051 Madrid – Spain

Modernisation of the treatment facility in La Paloma

Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 110 000 tonnes per year (methanisation)
Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit 

Biogas Production : 127 Nm3/t entering methanisation
Starting date : 2008
Adress : Ctra. N-III. Km. 14 - (Villa de Vallecas) - 28051 Madrid – Spain


Methanisation plant in Saragossa (Spain) 

Project owner : City of Saragosse (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 95 500 t/year of solid household waste
Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit

Starting date : 2008
Adress : Pol.Parq Tecnologico Reciclado 18 - 50720 Saragosse – Spain

Methanisation plant in the Ecopark of Abrunheira (Portugal)

Project owner : TRATOLIXO (Portugal)
Type of contract : Design, construction, and commissioning of the methanisation facility
Treatment capacity :

  • 160 000 t/year of solid household waste
  • 40 000 t/year of biowaste

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion (Valorga)
  • Aerobic maturation unit
  • Waste air treatment unit
  • Liquid waste treatment station

Biogas Production : 130-150 Nm3/t
Starting date : 2010
Adress l’ : Encosta di Sonivel - Nos Freguesios do San Miguel de Acaiçã e Mal Veiva - Municipio de Mafra - Distrito de Lisboa - Portugal

 

Multi-utility facility in Romainville (France)


Project owner :
SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)

Type of contract : Reconstruction and operation of the selective collection sorting facility
Treatment capacity : Selective collection sorting facility: : 52 000 t/year
Starting Date : January 2015
Adress : 62 rue Anatole France - 93200 Romainville - France

Multi-utility facility in Romainville (France)


Project owner :
SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)

Type of contract : Operating the multi-utility facility of Romainville
Treatment capacity : Selective collection sorting facility: : 52 000 t/year
Starting date : June 2008
Adress : 62 rue Anatole France - 93200 Romainville - France

Household waste sorting and composting Facility in Château d’Olonne

Project owner : TRIVALIS (85)
Type of contract : Design, construction, and project management of a mechanical-biological sorting and composting plant for household and related waste
Treatment capacity :

  • 36 000 t/year of residual household waste
  • 10 000 t/year of bulky household waste

Technology implemented :

  • Pre-fermentation by 1 rotating drum
  • Mechanical sorting line
  • Aerobic fermentation in tunnelss
  • Aerobic maturation
  • Waste air treatment unit

Starting date : 2012
Adress : Les Taffeneaux, 85180 Le Château-d'Olonne - France


Household waste sorting and composting Facility in Château d’Olonne

Household waste recovery unit in Bayonne (Canopia)


Project owner : BIL TA GARBI (64)
Type of contract : Design, construction, project management, and operation
Treatment capacity :

  • 83 696 t/year of solid household waste
  • 15 000 t/year separated collection
  • 1 500 t/year biowaste

Technology implemented :

  • Pre-fermentation by 3 rotating drums
  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit

Biogas Production : 140 Nm3/t entering methanisation
Starting date : 1st semester 2014
Website : http://www.biltagarbi.com/les-equipements/canopia/
Adress : Route départementale 817 lieu-dit Site de Batz – 64000 Bayonne - France


Household waste recovery unit in Bayonne (Canopia)

Organic Recovery Facility (French CVO) for biowaste in Calaisis

Project owner : SEVADEC (62)
Type of contract : Design, construction, project management, and “turnkey” commissioning
Treatment capacity :

  • 27 000 t/year of compostable waste
  • 1 000 t/year of greases

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion (Valorga process)
  • Aerobic maturation in ventilated tunnels
  • Waste air treatment unit

Biogas Production : 110 - 120 Nm3/t entering methanisation
Electric power generation : 4 500 MWh/year
Starting date : 2007  Operating since April 2014
Adress : 281 rue Jacques Monod - 62101 Calais - France

Organic Recovery Facility (French CVO) for biowaste in Calaisis


Methanisation plant of Beijing (China)

Type of contract : Engineering, supply of process equipment, and commissioning of the methanisation unit 
Treatment capacity : 105 000 t/year of the separated organic fraction from household waste
Technology implemented :

  • Unit for introducing organic matter by piston pump
  • Valorga digesters (3 digesters, 4 500 m3 each)
  • Digestate dehydration unit

Starting date : 2012
Adress : Dong Cun District – Beijing- China

Methanisation plant of Shangaï (China)

Type of contract : Engineering, supply of process equipment, and commissioning
Treatment capacity :

  • 227 500 t/year of solid household waste
  • 41 000 t/year of compostable waste

Technology implemented :

  • Unit for introducing organic matter by piston pump
  • Valorga digesters (3 digesters, 4 500 m3 each)
  • Digestate dehydration unit

Starting date : 2008
Adress : Putuo District - Shanghaï - China

 

Household waste sorting and composting facility in Caupenne

Project owner : SIETOM of Chalosse (40)
Type of contract : Design, construction, and project management of the solid household waste sorting and composting plant

Treatment capacity : 25 000 t/year of solid household waste
Technology implemented l’ :

  • Pre-fermentation by 1 rotating drum
  • Mechanical sorting line
  • Aerobic fermentation in halls
  • Aerobic maturation
  • Waste air treatment unit

Starting date : 2011
Adress : 815 route des Partenses - 40250 Caupenne - France