Treatment references

Multi-utility waste treatment facility in Fos-sur-Mer


Urbaser Environnement - Fos sur MerUrbaser Environnement - Fos sur Mer

Adress of the plant :

Route du Port Minéralier
Zone Caban Sud
13210 Fos sur Mer

France

Project owner :

Métropole Aix-Marseille Provence (13)

Type of contract :

Design, construction, financing, project management, and operation of a multi-utility waste treatment facility

Treatment capacity :

410 000 t/year of household and related waste

Technology implemented :










  • Mechanical sorting line for solid household waste

  • Methanisation unit for the organic fraction of solid household waste after sorting

  • Waste-to-Energy unit for the combustible fraction of waste after sorting

  • Waste air treatment unit

  • Excess water treatment unit

Electric power generation :

240 GWh/year



Organic Recovery Facility (French CVO) for biowaste in Calaisis


 

Urbaser Environnement - Sevadec CVOMR

Adress :

281 rue Jacques Monod
62101 Calais - 
France

Project owner : SEVADEC (62)
Type of contract :
Design, construction and project management
Treatment capacity :


  • 46 000 t/y of household wastes
  • 6 000 t/y of landfilling
  • 800 t/y of cumbersome
Technology implemented :







  • Mechanical sorting line
  • Anaerobic digestion (Valorga Process)



Methanisation plant in Varennes-Jarcy


Urbaser Environnement - VarennesUrbaser Environnement - Varennes

Adress of the plant :

SIVOM de la Vallée de l'Yerres et des Sénarts
Route du Tremblay
91480 Varennes-Jarcy

France

Project owner :

SIVOM de la Vallée de l’Yerres et des Sénarts (91)

Type of contract :

Public service delegation to operate the household waste separation-methanisation-composting plant

Treatment capacity :

  • 70 000 t/year of residual household waste

  • 6 000 t/year of green waste

Technology implemented :













  • Pre-processing by 2 rotating drums

  • Mechanical sorting line

  • Methanisation unit (Valorga process)

  • Aerobic maturation in halls

  • Excess water treatment unit


Methanisation plant in Tondela (Portugal)


Urbaser Environnement - Tondela
Adress of the plant :

Vale de Marguanda
3465-013 
Campo de Besteiros Viseu

Portugal

Project owner :

City of Tondela

Type of contract :

Design, construction (except civil engineering), project management, and commissioning of the methanisation unit

Treatment capacity :

  • 30 000 t/year of solid household waste
  • 5 000 t/year of compostable waste

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion (Valorga process)
  • Post-composting
  • Waste air treatment unit 

Biogas production :







136 Nm3/t entering methanisation



Waste sorting and composting facility in Beauregard Baret


Urbaser Environnement - Beauregard
Adress of the plant :

D532,
26300 Beauregard-Baret

France

Project owner :

SYTRAD (26)

Type of contract :

Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility

Treatment capacity :

30 000 t/year of solid household waste

Technology implemented :

  • Pre-fermentation by 2 rotating drums

  • Mechanical sorting line

  • Aerobic fermentation in halls

  • Aerobic maturation

  • Waste air treatment unit



Waste sorting and composting facility in Saint Barthélémy de Vals


Urbaser Environnement - St Barthelemy

Adress :

D532,
26300 Beauregard-Baret

France

Project owner :

SYTRAD (26)

Type of contract :

Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility

Treatment capacity :

40 000 t/year of solid household waste

Technology implemented :

  • Pre-fermentation by 2 rotating drums

  • Mechanical sorting line

  • Aerobic fermentation in halls

  • Aerobic maturation

  • Waste air treatment unit



Modernisation of the Las Dehesas Environmental Complex 


Urbaser Environnement - Las dehesas

Adress of the plant :

Ctra. N-III. Km. 14 
(Villa de Vallecas) 
28051 Madrid -

Spain

Project owner :

Community of Madrid (Spain)

Type of contract :

Design and commissioning of the methanisation unit

Treatment capacity :

195 200 t/year of solid household waste 

Technology implemented :

  • Mechanical sorting line
  • Anaerobic digestion unit (Valorga process)
  • Aerobic maturation
  • Waste air treatment unit 

Biogas production :

130 Nm3/t entering methanisation



Modernisation of the treatment facility in La Paloma


Urbaser Environnement - La Paloma

Adress of the plant :

Ctra. N-III. Km. 14 
(Villa de Vallecas) 
28051 Madrid -

Espagne

Project owner :

Community of Madrid (Spain)

Type of contract :

Design and commissioning of the methanisation unit

Treatment capacity :

110 000 tonnes per year (methanisation)

Technology implemented :

  • Mechanical sorting

  • Methanisation (Valorga process)

  • Drying tunnels

  • Air treatment

Biogas production :


127 Nm3/t entering methanisation



Methanisation plant in Saragossa (Spain) 


Urbaser Environnement - Saragosse

Adress of the plant :

Pol.Parq Tecnologico Reciclado 18 50720 Saragosse

Espagne

Project owner :

City of Saragossa (Spain)

Type of contract :

Design and commissioning of the methanisation unit

Treatment capacity :

95 500 t/year of solid household waste

Technology implemented :




  • Mechanical sorting line

  • Anaerobic digestion unit (Valorga process)

  • Aerobic maturation

  • Waste air treatment unit



Multi-utility facility in Romainville


Urbaser Environnement - Romainville

Adress of the plant :

62 rue Anatole France
93200 Romainville

France

Project owner :

SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)

Type of contract :

Reconstruction and operation of the selective collection sorting facility

Treatment capacity :






Selective collection sorting facility: 45 000 t/year (extendible to 60 000 t/year)



Methanisation plant in the Ecopark of Abrunheira (Portugal)


Urbaser Environnement - Tratolixo

Adress of the plant :

Encosta di Sonivel
Nos Freguesios do San Miguel de Acaiçã e Mal Veiva
Municipio de Mafra
Distrito de Lisboa

Portugal

Project owner :

TRATOLIXO (Portugal)

Type of contract :

Design, construction, and commissioning of the methanisation facility

Treatment capacity :

  • 160 000 t/year of solid household waste
  • 40 000 t/year of biowaste

Technology implemented :


  • Mechanical sorting line

  • Anaerobic digestion (Valorga)

  • Aerobic maturation unit

  • Waste air treatment unit

  • Liquid waste treatment station

Biogas production :


130-150 Nm3/t



Household waste sorting and composting Facility in Château d’Olonne


Urbaser Environnement - Trivalis



Adress of the plant :

Les Taffeneaux,
85180 Le Château-d'Olonne

France

Project owner :

TRIVALIS (85)

Type of contract :


Design, construction, and project management of a mechanical-biological sorting and composting plant for household and related waste

Treatment capacity :

  • 36 000 t/year of residual household waste
  • 10 000 t/year of bulky household waste

Technology implemented :

  • Pre-fermentation by 1 rotating drum

  • Mechanical sorting line

  • Aerobic fermentation in tunnelss

  • Aerobic maturation

  • Waste air treatment unit



Household waste recovery unit in Bayonne (Canopia)