Multi-utility waste treatment facility in Fos-sur-Mer
Project Owner : Métropole Aix-Marseille Provence (13)
Type of contract : Design, construction, financing, project management, and operation of a multi-utility waste treatment facility
Treatment capacity : 410 000 t/year of household and related waste
Technology implemented :
- Mechanical sorting line for solid household waste
- Methanisation unit for the organic fraction of solid household waste after sorting
- Waste-to-Energy unit for the combustible fraction of waste after sorting
- Waste air treatment unit
- Excess water treatment unit
Electric power generation : 240 GWh/Year
Website : www.evere.fr
Adress : Route du Port Minéralier - Zone Caban Sud - 13210 Fos sur Mer - France
Organic Recovery Facility (French CVO) for Household waste in Calaisis
Project owner : SEVADEC (62)
Type of contract : Design, construction and project management
Treatment capacity :
- 46 000 t/y of household wastes
- 6 000 t/y of landfilling
- 800 t/y of cumbersome
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion (Valorga Process)
Starting date : 2020
Adress : 281 rue Jacques Monod - 62101 Calais - France
Methanisation plant in Varennes-Jarcy
Project owner : SIVOM de la Vallée de l’Yerres et des Sénarts (91)
Type of contract : Public service delegation to operate the household waste separation-methanisation-composting plant
Treatment capacity :
- 45 000 t/year of residual household waste
- 30 000 t/year of green waste
Technology implemented :
- Pre-processing by 2 rotating drums
- Mechanical sorting line
- Methanisation unit (Valorga process)
- Aerobic maturation in halls
- Excess water treatment unit
Adress : SIVOM de la Vallée de l'Yerres et des Sénarts - Route du Tremblay - 91480 Varennes-Jarcy - France
Methanisation plant in Tondela (Portugal)
Project owner : City of Tondela
Type of contract : Design, construction (except civil engineering), project management, and commissioning of the methanisation unit
Treatment capacity :
- 30 000 t/year of solid household waste
- 5 000 t/year of compostable waste
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion (Valorga process)
- Post-composting
- Waste air treatment unit
Biogas Production : 136 Nm3/t entering methanisation
Starting date : 2010
Adress : Vale de Marguanda - 465-013 Campo de Besteiros Viseu - Portugal
Waste sorting and composting facility
in Beauregard Baret
Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 30 000 t/year of solid household waste
Technology implemented :
- Pre-fermentation by 2 rotating drums
- Mechanical sorting line
- Aerobic fermentation in halls
- Aerobic maturation
- Waste air treatment unit
Electric power generation : 240 GWh/an
Starting date : 2010
Adress : D532 - 26300 Beauregard-Baret - France
Centre de tri-compostage
de Saint Barthélémy de Vals
Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 40 000 t/year of solid household waste
Technology implemented l’ :
- Pre-fermentation by 2 rotating drums
- Mechanical sorting line
- Aerobic fermentation in halls
- Aerobic maturation
- Waste air treatment unit
Starting date : 2010
Adresse : D532 - 26300 Beauregard-Baret - France
Centre de tri-compostage d’Etoile sur Rhône
Project owner : SYTRAD (26)
Type of contract : Design, construction, supervision, and “turnkey” commissioning of the waste sorting and composting facility
Treatment capacity : 40 000 t/year of solid household waste
Technology implemented l’ :
- Pre-fermentation by 2 rotating drums
- Mechanical sorting line
- Aerobic fermentation in halls
- Aerobic maturation
- Waste air treatment unit
Starting date : 2012
Adress : D532 - 26300 Beauregard-Baret - France
Modernisation of the Las Dehesas Environmental Complex
Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 195 200 t/year of solid household waste
Technology implemented :
- Chaîne de tri mécanique
- Unité de digestion anaérobie (procédé Valorga)
- Maturation aérobie
- Unité de traitement de l’air vicié
Biogas Production : 130 Nm3/t entering methanisation
Starting date : 2008
Adress : Ctra. N-III. Km. 14 - (Villa de Vallecas) - 28051 Madrid – Spain
Modernisation of the treatment facility in La Paloma
Project owner : Community of Madrid (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 110 000 tonnes per year (methanisation)
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion unit (Valorga process)
- Aerobic maturation
- Waste air treatment unit
Biogas Production : 127 Nm3/t entering methanisation
Starting date : 2008
Adress : Ctra. N-III. Km. 14 - (Villa de Vallecas) - 28051 Madrid – Spain
Methanisation plant in Saragossa (Spain)
Project owner : City of Saragosse (Spain)
Type of contract : Design and commissioning of the methanisation unit
Treatment capacity : 95 500 t/year of solid household waste
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion unit (Valorga process)
- Aerobic maturation
- Waste air treatment unit
Starting date : 2008
Adress : Pol.Parq Tecnologico Reciclado 18 - 50720 Saragosse – Spain
Methanisation plant in the Ecopark of Abrunheira (Portugal)
Project owner : TRATOLIXO (Portugal)
Type of contract : Design, construction, and commissioning of the methanisation facility
Treatment capacity :
- 160 000 t/year of solid household waste
- 40 000 t/year of biowaste
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion (Valorga)
- Aerobic maturation unit
- Waste air treatment unit
- Liquid waste treatment station
Biogas Production : 130-150 Nm3/t
Starting date : 2010
Adress l’ : Encosta di Sonivel - Nos Freguesios do San Miguel de Acaiçã e Mal Veiva - Municipio de Mafra - Distrito de Lisboa - Portugal
Multi-utility facility in Romainville (France)
Project owner : SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)
Type of contract : Reconstruction and operation of the selective collection sorting facility
Treatment capacity : Selective collection sorting facility: : 52 000 t/year
Starting Date : January 2015
Adress : 62 rue Anatole France - 93200 Romainville - France
Multi-utility facility in Romainville (France)
Project owner : SYCTOM, l’Agence Métropolitaine des déchets ménagers (intercommunal household waste treatment and recycling syndicate) (75)
Type of contract : Operating the multi-utility facility of Romainville
Treatment capacity : Selective collection sorting facility: : 52 000 t/year
Starting date : June 2008
Adress : 62 rue Anatole France - 93200 Romainville - France
Household waste sorting and composting Facility in Château d’Olonne
Project owner : TRIVALIS (85)
Type of contract : Design, construction, and project management of a mechanical-biological sorting and composting plant for household and related waste
Treatment capacity :
- 36 000 t/year of residual household waste
- 10 000 t/year of bulky household waste
Technology implemented :
- Pre-fermentation by 1 rotating drum
- Mechanical sorting line
- Aerobic fermentation in tunnelss
- Aerobic maturation
- Waste air treatment unit
Starting date : 2012
Adress : Les Taffeneaux, 85180 Le Château-d'Olonne - France
Household waste recovery unit in Bayonne (Canopia)
Project owner : BIL TA GARBI (64)
Type of contract : Design, construction, project management, and operation
Treatment capacity :
- 83 696 t/year of solid household waste
- 15 000 t/year separated collection
- 1 500 t/year biowaste
Technology implemented :
- Pre-fermentation by 3 rotating drums
- Mechanical sorting line
- Anaerobic digestion unit (Valorga process)
- Aerobic maturation
- Waste air treatment unit
Biogas Production : 140 Nm3/t entering methanisation
Starting date : 1st semester 2014
Website : http://www.biltagarbi.com/les-equipements/canopia/
Adress : Route départementale 817 lieu-dit Site de Batz – 64000 Bayonne - France
Organic Recovery Facility (French CVO) for biowaste in Calaisis
Project owner : SEVADEC (62)
Type of contract : Design, construction, project management, and “turnkey” commissioning
Treatment capacity :
- 27 000 t/year of compostable waste
- 1 000 t/year of greases
Technology implemented :
- Mechanical sorting line
- Anaerobic digestion (Valorga process)
- Aerobic maturation in ventilated tunnels
- Waste air treatment unit
Biogas Production : 110 - 120 Nm3/t entering methanisation
Electric power generation : 4 500 MWh/year
Starting date : 2007 Operating since April 2014
Adress : 281 rue Jacques Monod - 62101 Calais - France
Methanisation plant of Beijing (China)
Type of contract : Engineering, supply of process equipment, and commissioning of the methanisation unit
Treatment capacity : 105 000 t/year of the separated organic fraction from household waste
Technology implemented :
- Unit for introducing organic matter by piston pump
- Valorga digesters (3 digesters, 4 500 m3 each)
- Digestate dehydration unit
Starting date : 2012
Adress : Dong Cun District – Beijing- China
Methanisation plant of Shangaï (China)
Type of contract : Engineering, supply of process equipment, and commissioning
Treatment capacity :
- 227 500 t/year of solid household waste
- 41 000 t/year of compostable waste
Technology implemented :
- Unit for introducing organic matter by piston pump
- Valorga digesters (3 digesters, 4 500 m3 each)
- Digestate dehydration unit
Starting date : 2008
Adress : Putuo District - Shanghaï - China
Household waste sorting and composting facility in Caupenne
Project owner : SIETOM of Chalosse (40)
Type of contract : Design, construction, and project management of the solid household waste sorting and composting plant
Treatment capacity : 25 000 t/year of solid household waste
Technology implemented l’ :
- Pre-fermentation by 1 rotating drum
- Mechanical sorting line
- Aerobic fermentation in halls
- Aerobic maturation
- Waste air treatment unit
Starting date : 2011
Adress : 815 route des Partenses - 40250 Caupenne - France